Well, today didn't start off on the greatest note. Our circular saw had some issues and jammed up. Our friend, who was coming to help us, had forgotten about a previous engagement and wasn't able to come. We realized we bought the wrong size of pipe for the shower drain. I was almost in tears at noon with everything that was going wrong. We were supposed to make great progress today and now it wasn't going to happen. Thankfully we were able to return the saw for a new [and better] one, and we bought the right size of pipe while at home depot for the saw. We thought we were all ready to square off the "hole" and patch with plywood, so we thought we were going to get a lot of the "heavy lifting" done today. But the reality was that we had to pound in most of the nails, remove some of them that were close to where we'd be making the cut and we still had a few pieces of the top layer of plywood to remove, so we had plenty to do and got a lot done. By 8:30 PM we'd squared off the hole, removed all the stray staples and nails and cleaned up after ourselves. Here's what it looks like: Notice that we had to tear a bunch of the closet floor out too.

We went to put the shower pan in to mark where we needed to make the whole in the floor to rough in the drain for the shower, and guess what...it was about 1/4 of an inch too big. They only make shower pans in certain "standard" sizes and 60 inches was the one that the measurements told us we'd need. Not to worry, this is just a hurdle, and we think we've figured out how to take care of it. See the plywood under the backerboard on the right side of the picture...there is our 1/4 inch! Once we take a piece of it out, our shower pan should slide right in. Whoever did the previous bathroom remodel was plywood-happy, that's for sure.

We're inching closer and closer. What started out as a downer day, actually turned out OK.

No comments: